Saturday, August 26, 2006

septic system installed


septic line through the woods

our new septic system is installed and inspected. so we can poop. well almost...we need a toilet and some water to flush it with. that's coming. our well installer will be placing a pump in the well next week with temporary piping for construction purposes. this will allow us to do concrete work once our building permit comes through. we'll also be able to do our water tests, the kits for which i've received from the state.

next week our excavator will finish up the other work we have scheduled, including grading for garden terraces and the gathering circle as well as drainage work around future building sites. he'll also repair the road which has suffered under the construction traffic.