Engineering
I spoke with our wastewater engineer, Jane Morano, this morning. She is going to draw up a new set of prints for our wastewater plan based on the final location of the bathhouse and kitchen. She thinks she'll have them done some time this week which is great because we need to file for an amendment as soon as possible so that we can drill the well, get the septic and water system in by fall. Destiny will be a different place with running water!
0 Comments:
Post a Comment
<< Home