Thursday, October 30, 2008

Development Site

We have been developing different building types.  These are very rough images of work in progress.  Today we met the engineer again and have refined the structural details.  These will be in a later blog.  We are very excited with the project and everyone the stage today was very impressed.

Site Layouts with sauna performance hill in foreground. Massage, changing and shower in the back.

Coceptual  3d  of the Masaage Mushroom with wood strip screen.

Shower "mushroom" screen wall studies.

Labels:

0 Comments:

Post a Comment

<< Home